Product Description
Fully-Automatic RO Water Treatment System with CIP Cleaning
Product Description:
Reverse Osmosis Water Treatment Machine isused to treat raw water to mineral water or pure water to be drinkable for bottle filling. Mian include: Raw water source, booster pump, quartz sand filter, active carbon filter, water softener, Cartridge filter, reverse osmosis, UV sterilizer, pure water storage tank, ozone machine,Anti-scale system.
Technical parameters:
Model | Capacity (LPH) | Power (kw) | RO membrane (8040 / 4040) |
RO-1000 | 1000 | 2.5 | 4040 |
RO-2000 | 2000 | 3.5 |
RO-3000 | 3000 | 4.5 |
RO-4000 | 4000 | 6.5 | 8040 |
RO-5000 | 5000 | 8 |
RO-6000 | 6000 |
RO-8000 | 8000 | 12 |
RO-10000 | 10000 | 18 |
RO-15000 | 15000 |
RO-20000 | 20000 | 28 |
Advantages:
1. Material : Stainless steel SUS304, SUS316 or FRP
2. High automatically, PLC controlled;Imported of high-pressure membrane which come fromUSA. The rate of desalination is reach 97%-98%;
3. Running stable, high desalination and recovery rate;
4. Highly efficient and low energy consumption;
Application:
Reverse osmosis water plant isused to treat raw water to mineral water or pure water to be drinkable for bottle filling.
Packing and delivery:
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:
1. When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2. How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3. What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4. How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
Installation and maintenance:
The machines should have good maintenance twice for 6 months, and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Video: