Choose By Bottles

Automatic Metal Juice Capping Machine

This kind of capping machine is used for capping twist off caps; it includes auto cap loader and capping system 2 parts.

Technical Specifications

Model FXZ-1 FXZ-4 FXZ-6 FXZ-8 FXZ-10 FXZ-12
Production capacity

(BPH)

2000 4000 6000 8000 10000 12000
Basing on cap size
Cap type Twist off cap

40mm

Cap sorting manner Vibration cap sorter
Motor power (kw) 0.55 1.1 1.5 2.2 2.5 2.5
Machine size (mm) 900*710*1800 1000*1000*1800 1100*1010*1800 1200*1200*1800 1250*1250*1800 1300*1300*1800
Weight (kg) 400 450 500 550 600 650

Description

Product Description:

 

Automatic Metal Cap Capping Machine is used for capping twist off caps; it includes auto cap loader and capping system 2 parts. Workers put bulk qty caps into cap loader, the cap loader will unscramble caps automatically and bring caps down in cap rail and then to capping head. Cap loader can hold more than 200pcs of caps each time, it will be convenient for adding caps often. When capping head catch cap, it will go down to bottle mouth and finish capping

 

Application:

Automatic Metal Cap Capping Machine is used for capping twist off caps; it includes auto cap loader and capping system 2 parts. Workers put bulk qty caps into cap loader, the cap loader will unscramble caps automatically and bring caps down in cap rail and then to capping head.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Contact Now