Choose By Bottles

Complete Drinking Water Filling Machine

Complete drinking water filling machine is used to treat raw water to mineral water or pure water to be drinkable for bottle filling.

Technical Specifications

Item Description Material Filter element Function
Booster pump SUS304 / To pump raw water into pre-treatment tanks
Quartz sand filter SUS304 Coarse sand

Medium sand

Fine sand

To remove metal and large particle in water
Active carbon filter SUS304 Quartz sand

Active carbon

To absorb color and foreign smell in water
Water softener SUS304 Anion

Cation

To reduce the water hardness in water
Ion rebirth device ABS tank Salin water To clean the ion in water softener to realize recycling
Cartridge filter SUS304 PP film To filter the water before entering reverse osmosis and protect the RO membrane
Reverse osmosis SUS304

FRP

8040/4040 membrane To reduce the salt in water
UV sterilizer SUS304 UV lamp To kill the bacteria in water
Pure water storage SUS304 / To store pure water
Ozone machine / Ozone generator To kill the bacteria in water

Description

Product Description:

Complete drinking water filling machine is used to treat raw water to mineral water or pure water to be drinkable for bottle filling.

Raw water can be city water, well water, lake water, spring water, part river water etc. Pre-treatment: booster pump, quartz sand filter, active carbon filter, water softener, ion rebirth device, cartridge filter.

After treatment: reverse osmosis, Anti-scale system, UV sterilizer, pure water storage tank, ozone machine

Application:

Complete Drinking Water Filling Machine is a monoblock machine, Monoblock means the filling machine integrates washing machine, filling machine and capping machine in one frame. The driving system will be transmitted step by step which makes the speed more stable.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Contact Now