Choose By Bottles

Fruit Juice Filling Machine

Fruit juice filling machine preparation system includes: Steam boiler (prepared by customer), hot water system, jacket high shear emulsification tank (high speed), jacket beverage mixing tank (medium speed), double filter, high pressure homogenizer, plate sterilizer, insulation balance tank, drink pump, CIP system, electric control system, connection pipe, cable bridge etc.

Technical Specifications

Production capacity Total power Steam consumption
(LPH) Kw Kg
1000 20.1 500
1500 66.25 600
2000 68 600
3000 82.75 600
3500 82.75 650
5000 93.75 1750

Description

  • Concentrate juice preparation system is used for making juice from juice concentrate which can be sold in the market. The temperature of final mixed juice is around 85 – 90 degree centigrade. So the juice will be filled into bottles by hot filling machine. Once the filling temperature is lower than 85 – 90 degree centigrade, it will be back to sterilizing machine again.

Application:

Fruit juice filling machine preparation system is used for making juice from juice concentrate which can be sold in the market.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Contact Now