This bottle Beer Filling Machine Wash-filling-capping 3-in-1unit is used to produce glass bottled beer. The BCGF series of 3 in 1 monobloc rinisng, vacuum filling, capping machine adopts advanced technologies of double evacuations before filling and high pressure hot water injection system after Beer filling. These technologies remarkably reduce oxygen content in bottle beer, improve taste of beer much. They have been widely used in glass bottle beer filling machine technology in the world.

Technical Specifications

Model Production capacity Rinsing heads Filling heads Pull Ring Capping heads Bottle size Main motor power (KW)
Diameter

(mm)

Height (mm)
BCGF 12-12-4 1500 12 12 4 30-90 100-320 2.2
BCGF 18-18-6 2500 18 18 6 30-90 100-320 3
BCGF 24-24-8 4000 24 24 8 30-90 100-320 4
BCGF 32-32-10 6500 32 32 10 30-90 100-320 5
BCGF 40-40-12 8500 40 40 12 30-90 100-320 6.5
BCGF 60-60-12 12000-15000 60 60 15 30-90 100-320 7.5

Description

Features:

1. Using the conveyor sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.

2. Bottles transmission adopt clip bottle neck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.

3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.

4. High-speed balanced pressure flow valve filling valve, filling fast, filling accurate and no liquid spit out.

5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.

6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan’s Mitsubishi, France Schneider, OMRON or ABB.

7. The CIP cleaning solution gets in contact with every part and interstice of the valves.

8. With Central greasing system.

9. Replacement valves are adopted. The complete filling process will be as below:

①, The replacement valve is linking with air drum, CO2 inside air drum enter bottles via replacement valve. The gas inside bottle now is mixing with CO2 and air.

②, Air exhausting valve is opened via cam to exhaust the mixed gas.

③, Refill CO2 into bottle again.

④, Operation valve open, after the pressure between cylinder and bottle is equal, the filling process starts, when the filling level reach air returning pipe, filling stops, filling valves closed.

⑤, After filling process finishing, before filling valves leaving bottles, air exhausting valve exhaust extra gas, then filling valves leave bottle neck, filling process finishes.