Plastic Bottle Juice Filling Machine is mainly designed for filling hot temperature liquid.
HOME » Products » Liquid Filling Machine » By Liquids » Juice Filling Machine » Plastic Bottle Juice Filling Machine
Plastic Bottle Juice Filling Machine is mainly designed for filling hot temperature liquid.
Model: | RCGF12-12-4 | RCGF18-18-6 | RCGF24-24-8 | RCGF32-32-10 | RCGF40-40-12 | RCGF50-50-15 | RCGF60-60-15 |
---|---|---|---|---|---|---|---|
Capacity:
B/H (500ml) |
3000-4000 | 7000-8000 | 10000-12000 | 12000-15000 | 15000-18000 | 20000-22000 | 22000-25000 |
Bottle shape: | Normal round or square | ||||||
PET bottle:
(mm) |
(Bottle Diameter): φ50-φ110mm (Height): 150-310mm
Volume: 250ml -2000ml |
||||||
Cap: | Plastic screw cap | ||||||
Filling precision: | ≤ ±5mm | ||||||
Return system | High position tank: 1 set; return tank: 1 set; vacuum pump: 1 set; booster pump: 1 set | ||||||
Material | Stainless steel 304; touch part: 316 | ||||||
Power(KW) | 3.0 | 4.0 | 4.2 | 5.2 | 6.2 | 7.5 | 8.5 |
Gas source pressure: | 6 bar | ||||||
Rinsing pressure: | 2-2.5 bar | ||||||
Overall size:(mm) | 1900*1500*2350 | 2250*1650*2350 | 2600*1965*2350 | 2980*2200*2250 | 3880*2200*2250 | 4000*2250*2250 | 5500*3500*2250 |
Weight:
(KG) |
2500 | 3500 | 4500 | 6500 | 8500 | 9800 | 12000 |
PLC | Mitsubishi / Siemens |
---|---|
Touch screen | Mitsubishi / Siemens |
Contactor | Schneider |
Rely | Schneider |
Transducer | Shilin / Mitsubishi / Panasonic |
Light sensor | Autonics |
Power | Mingwei |
Pneumatic parts | Airtac / Festo |
Stainless steel | ZPSS |
Motor | Domestic brand / Siemens / ABB |
Bearing | Domestic brand / NSK |
Applications:
Plastic Bottle Juice Filling Machine is mainly designed for filling hot temperature liquid into PET bottle; For example juice, tea drinks etc which are made of concentrate juice.
Packaging & Delivery:
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
FAQ:
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
Installation and maintenance:
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
0086-512-58552999/0086-512-58966209
0086-18962226721
Zhangjiagang city new crown machinery, Zhenbei Road, Leyu TownZhangjiagang City, Jiangsu Provice China.